Kingston Utilities Tunnel

project photo

GEMTEC undertook a detailed geotechnical investigation for a large sewer forcemain, from the River Street Pump Station to Baseline Road.

Project components included:

  • Boreholes with bedrock coring along the proposed service alignments
  • Installation of standpipe piezometers to determine groundwater levels and hydraulic conductivity of the bedrock
  • Geotechnical report with design recommendations
  • Geotechnical engineering support during construction
  • Materials testing and inspection during construction